免费不卡中文字幕在线|久久做人人做人人综合|初尝黑人嗷嗷叫中文字幕|国产成人v片视频在线观看|欧美日本国产VA高清视频|亚洲国产精品国自产拍AV|国产欧美精品一区二区色综合|微拍国产私拍福利88精品视频

  • <button id="0gwi0"></button>
    <tfoot id="0gwi0"></tfoot>
  • <dl id="0gwi0"><acronym id="0gwi0"></acronym></dl>
    <li id="0gwi0"></li>
    <rt id="0gwi0"><acronym id="0gwi0"></acronym></rt>
  • <rt id="0gwi0"></rt>
  •  
    Chinese firm completes beam closure along China-Laos railway
                     Source: Xinhua | 2019-01-20 09:15:42 | Editor: huaxia

    The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

    NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

    China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

    The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

    The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

    The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

    Back to Top Close
    Xinhuanet

    Chinese firm completes beam closure along China-Laos railway

    Source: Xinhua 2019-01-20 09:15:42

    The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

    NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

    China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

    The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

    The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

    The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

    010020070750000000000000011100001377588261