免费不卡中文字幕在线|久久做人人做人人综合|初尝黑人嗷嗷叫中文字幕|国产成人v片视频在线观看|欧美日本国产VA高清视频|亚洲国产精品国自产拍AV|国产欧美精品一区二区色综合|微拍国产私拍福利88精品视频

  • <button id="0gwi0"></button>
    <tfoot id="0gwi0"></tfoot>
  • <dl id="0gwi0"><acronym id="0gwi0"></acronym></dl>
    <li id="0gwi0"></li>
    <rt id="0gwi0"><acronym id="0gwi0"></acronym></rt>
  • <rt id="0gwi0"></rt>
  • China's first tidal power unit connected to grid for one year

    Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
    Video PlayerClose

    HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

    The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

    Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

    The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

    He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

    Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

    TOP STORIES
    EDITOR’S CHOICE
    MOST VIEWED
    EXPLORE XINHUANET
    010020070750000000000000011100001372231461