免费不卡中文字幕在线|久久做人人做人人综合|初尝黑人嗷嗷叫中文字幕|国产成人v片视频在线观看|欧美日本国产VA高清视频|亚洲国产精品国自产拍AV|国产欧美精品一区二区色综合|微拍国产私拍福利88精品视频

  • <button id="0gwi0"></button>
    <tfoot id="0gwi0"></tfoot>
  • <dl id="0gwi0"><acronym id="0gwi0"></acronym></dl>
    <li id="0gwi0"></li>
    <rt id="0gwi0"><acronym id="0gwi0"></acronym></rt>
  • <rt id="0gwi0"></rt>
  • Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

    Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
    Video PlayerClose
    CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

    Aerial photo taken on Feb. 12, 2019 shows emergency worker Dong Jinbing (L) inspecting the high voltage wire with his workmate Wang Wensheng on the power transmission tower in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

       1 2 3 4 5 Next  

    KEY WORDS:
    EXPLORE XINHUANET
    010020070750000000000000011100001378454891